# MANUFACTURING CAPABILITIES

## Every Manufacturing Process. One Platform.

Manufacturing process selection—from prototype to production. Evaluate materials, tolerances, and finishes across capabilities to find the right manufacturing method.

### CNC Machining Services

Precision parts as fast as 1 day

- **CNC Milling**
- **CNC Turning**
- **EDM**
- **Gear Hobbing**

**Materials**: 3, 4, and 5+ axis milling, turning, EDM, and gear hobbing with tolerances as tight as ±0.0001". 45+ metals and plastics available.

- **1 Day** (Fastest Lead Time)
- **±0.0001"** (Tolerance)
- **45+** (Materials)

[Get a CNC Quote](/content/signup/index.html) [Explore CNC Machining](/content/capabilities/cnc-machining-services/index.html)

### All Capabilities

### Injection Molding

Production-grade steel tooling in weeks

- **Lead Time**: 2 Weeks  
- **Tolerance**: ±0.005"  
- **Materials**: Any Resin

[Explore more](/content/capabilities/injection-molding-services/index.html)

### Sheet Metal

Versatility and cost efficiency at any volume

- **Lead Time**: 5 Days  
- **Tolerance**: ±0.005"  
- **Materials**: 15+

[Explore more](/content/capabilities/sheet-metal-services/index.html)

### 3D Printing

6 additive technologies, parts as fast as next-day

- **Lead Time**: 5 Days  
- **Tolerance**: ±0.005"  
- **Materials**: 15+

[Explore more](/content/capabilities/3d-printing-services/index.html)

### Die Casting

Complex metal parts at production volume

- **Lead Time**: 3 Weeks  
- **Tolerance**: ±0.002"  
- **Materials**: 8+

[Explore more](/content/capabilities/die-casting-services/index.html)

### Compression Molding

Lower tooling costs with durable parts

- **Lead Time**: 3 Weeks  
- **Tolerance**: ±0.010"  
- **Materials**: 10+

[Explore more](/content/capabilities/compression-molding-services/index.html)

### Urethane Casting

Production quality without tooling investment

- **Lead Time**: 10 Days  
- **Tolerance**: ±0.010"  
- **Materials**: 20+

[Explore more](/content/capabilities/urethane-casting-services/index.html)

## Not sure which manufacturing process to use?

Most engineers start with material and volume. Here's a quick comparison.

### Overview Table
| PROCESS             | BEST FOR                     | MATERIALS          | LEAD TIME    | QTY RANGE     | TOLERANCE   |
|---------------------|------------------------------|--------------------|--------------|---------------|-------------|
| CNC Machining       | Precision metal & plastic     | Metals, plastics    | 1–10 days    | 1–10,000      | ±0.0001"   |
| Injection Molding   | High-vol plastic parts        | Thermoplastics      | 2–6 weeks    | 500–1M+       | ±0.005"    |
| Sheet Metal         | Enclosures, brackets          | AL, steel, SS       | 5–15 days    | 1–50,000      | ±0.005"    |
| 3D Printing         | Complex geometry              | Plastics, resins    | 1–5 days     | 1–500         | ±0.005"    |
| Die Casting         | Complex metal at vol.        | AL, zinc, mag.      | 3–8 weeks    | 1K–500K+      | ±0.002"    |
| Urethane Casting    | Low-vol, no tooling          | PU resins           | 10–15 days   | 1–200         | ±0.010"    |
| Comp. Molding       | Rubber & composites           | Thermoset           | 3–6 weeks    | 100–50K       | ±0.010"    |

### Materials and Finishes

Explore 45+ metals, plastics, and finishes across all processes.

[Browse Materials](/content/materials-and-finishes/index.html)

### How It Works

Upload your design, get instant pricing and DFM feedback.

[See the Platform](/content/our-platform/index.html)

### Specifications and Tolerances

Tolerance tables, lead times, and calculators for every process.

[View Specifications](/content/specifications/index.html)

## Ready to get started?

Upload your design for an instant quote with DFM feedback.

[Get Instant Quote](/content/signup/index.html)
