## Manufacturing Specifications & Design Guidelines

## Specifications by Capability

Select a manufacturing process to view detailed specifications, tolerances, materials, and design guidelines.

### CNC Machining
Tolerances as tight as ±0.0001". 45+ materials. As fast as 1 day.
[View Specs→](/content/specifications/cnc-machining/index.html)

### Sheet Metal
Laser cutting, bending, welding. AL, steel, SS. 5–15 day lead time.
[View Specs→](/content/specifications/sheet-metal/index.html)

### 3D Printing
6 technologies: FDM, SLA, SLS, MJF, PolyJet, Carbon DLS.
[View Specs→](/content/specifications/3d-printing/index.html)

### Injection Molding
Rapid to production tooling. T1 samples in 10 days. Full PPAP.
[View Specs→](/content/specifications/injection-molding/index.html)

### Surface Finishes
Anodizing, powder coat, plating, ENP, passivation & 8 more.
[View Specs→](/content/specifications/surface-finishes/index.html)

### Calculators
Unit converter, thread checker, bend allowance, ISO fits.
[View Specs→](/content/specifications/calculators/index.html)

### GD&T Reference
Geometric tolerancing symbols, feature control frames, modifiers.
[View Specs→](/content/specifications/gdt-reference/index.html)

## Not sure which process fits your project?

Most engineers start with material and volume. Here's a quick comparison.

### CNC Machining
**Best For**: Precision metal & plastic  
**Materials**: Metals, plastics  
**Lead Time**: 1–10 days  
**Qty Sweet Spot**: 1–10,000  
**Tolerance**: ±0.0001"

### Injection Molding
**Best For**: Mid to High-volume  
**Materials**: Thermoplastics  
**Lead Time**: 2–6 weeks  
**Qty Sweet Spot**: 200-1M+  
**Tolerance**: ±0.005"

### Sheet Metal
**Best For**: Enclosures, brackets  
**Materials**: AL, steel, SS  
**Lead Time**: 2 - 14 days  
**Qty Sweet Spot**: 1–50,000  
**Tolerance**: ±0.005"

### 3D Printing
**Best For**: Complex geometry  
**Materials**: Plastics, resins  
**Lead Time**: 1–5 days  
**Qty Sweet Spot**: 1–500  
**Tolerance**: ±0.005"

### Die Casting
**Best For**: Complex metal at vol.  
**Materials**: AL, zinc, mag.  
**Lead Time**: 3–8 weeks  
**Qty Sweet Spot**: 1K–500K+  
**Tolerance**: ±0.002"

### Urethane Casting
**Best For**: Low-vol plastic  
**Materials**: PU resins  
**Lead Time**: 10–15 days  
**Qty Sweet Spot**: 1–200  
**Tolerance**: ±0.010"

### Compression
**Best For**: Rubber & composite  
**Materials**: Thermoset, rubber  
**Lead Time**: 3–6 weeks  
**Qty Sweet Spot**: 100–50K  
**Tolerance**: ±0.010"

| Process          | Best For                 | Materials            | Lead Time    | Qty Sweet Spot | Tolerance   |
|------------------|--------------------------|----------------------|--------------|----------------|-------------|
| CNC Machining   | Precision metal & plastic| Metals, plastics     | 1–10 days    | 1–10,000      | ±0.0001"   |
| Injection Molding| Mid to High-volume      | Thermoplastics       | 2–6 weeks    | 200-1M+       | ±0.005"    |
| Sheet Metal      | Enclosures, brackets     | AL, steel, SS       | 2 - 14 days  | 1–50,000      | ±0.005"    |
| 3D Printing      | Complex geometry         | Plastics, resins     | 1–5 days     | 1–500        | ±0.005"    |
| Die Casting      | Complex metal at vol.    | AL, zinc, mag.      | 3–8 weeks    | 1K–500K+      | ±0.002"    |
| Urethane Casting | Low-vol plastic         | PU resins            | 10–15 days   | 1–200        | ±0.010"    |
| Compression      | Rubber & composite      | Thermoset, rubber    | 3–6 weeks    | 100–50K      | ±0.010"    |

## Quality & Certifications

ISO 9001:2015  
Quality Mgmt  
ISO 13485:2016  
Medical Devices  
AS9100D  
Aerospace  
IATF 16949:2016  
Automotive & Electric Vehicles  
NADCAP  
Special Processes

## Ready to get started?

Upload your CAD file for instant DFM feedback and pricing.

[Get Instant Quote](/content/signup/index.html) [Talk to an Engineer](/content/contact/index.html)

ISO 9001:2015 Certified · 95.4% On-Time Delivery · Trusted by 3,000+ Companies
