Manufacturing Process Selection & Capabilities Hub | Fictiv
MANUFACTURING CAPABILITIES
Every Manufacturing Process. One Platform.
Manufacturing process selection—from prototype to production. Evaluate materials, tolerances, and finishes across capabilities to find the right manufacturing method.
CNC Machining Services
Precision parts as fast as 1 day
- CNC Milling
- CNC Turning
- EDM
- Gear Hobbing
Materials: 3, 4, and 5+ axis milling, turning, EDM, and gear hobbing with tolerances as tight as ±0.0001". 45+ metals and plastics available.
- 1 Day (Fastest Lead Time)
- ±0.0001" (Tolerance)
- 45+ (Materials)
Get a CNC Quote Explore CNC Machining
All Capabilities
Injection Molding
Production-grade steel tooling in weeks
- Lead Time: 2 Weeks
- Tolerance: ±0.005"
- Materials: Any Resin
Sheet Metal
Versatility and cost efficiency at any volume
- Lead Time: 5 Days
- Tolerance: ±0.005"
- Materials: 15+
3D Printing
6 additive technologies, parts as fast as next-day
- Lead Time: 5 Days
- Tolerance: ±0.005"
- Materials: 15+
Die Casting
Complex metal parts at production volume
- Lead Time: 3 Weeks
- Tolerance: ±0.002"
- Materials: 8+
Compression Molding
Lower tooling costs with durable parts
- Lead Time: 3 Weeks
- Tolerance: ±0.010"
- Materials: 10+
Urethane Casting
Production quality without tooling investment
- Lead Time: 10 Days
- Tolerance: ±0.010"
- Materials: 20+
Not sure which manufacturing process to use?
Most engineers start with material and volume. Here's a quick comparison.
Overview Table
| PROCESS | BEST FOR | MATERIALS | LEAD TIME | QTY RANGE | TOLERANCE |
|---|---|---|---|---|---|
| CNC Machining | Precision metal & plastic | Metals, plastics | 1–10 days | 1–10,000 | ±0.0001" |
| Injection Molding | High-vol plastic parts | Thermoplastics | 2–6 weeks | 500–1M+ | ±0.005" |
| Sheet Metal | Enclosures, brackets | AL, steel, SS | 5–15 days | 1–50,000 | ±0.005" |
| 3D Printing | Complex geometry | Plastics, resins | 1–5 days | 1–500 | ±0.005" |
| Die Casting | Complex metal at vol. | AL, zinc, mag. | 3–8 weeks | 1K–500K+ | ±0.002" |
| Urethane Casting | Low-vol, no tooling | PU resins | 10–15 days | 1–200 | ±0.010" |
| Comp. Molding | Rubber & composites | Thermoset | 3–6 weeks | 100–50K | ±0.010" |
Materials and Finishes
Explore 45+ metals, plastics, and finishes across all processes.
How It Works
Upload your design, get instant pricing and DFM feedback.
Specifications and Tolerances
Tolerance tables, lead times, and calculators for every process.
Ready to get started?
Upload your design for an instant quote with DFM feedback.