Manufacturing Specifications by Capabilities | Fictiv

Manufacturing Specifications & Design Guidelines

Specifications by Capability

Select a manufacturing process to view detailed specifications, tolerances, materials, and design guidelines.

CNC Machining

Tolerances as tight as ±0.0001". 45+ materials. As fast as 1 day. View Specs→

Sheet Metal

Laser cutting, bending, welding. AL, steel, SS. 5–15 day lead time. View Specs→

3D Printing

6 technologies: FDM, SLA, SLS, MJF, PolyJet, Carbon DLS. View Specs→

Injection Molding

Rapid to production tooling. T1 samples in 10 days. Full PPAP. View Specs→

Surface Finishes

Anodizing, powder coat, plating, ENP, passivation & 8 more. View Specs→

Calculators

Unit converter, thread checker, bend allowance, ISO fits. View Specs→

GD&T Reference

Geometric tolerancing symbols, feature control frames, modifiers. View Specs→

Not sure which process fits your project?

Most engineers start with material and volume. Here's a quick comparison.

CNC Machining

Best For: Precision metal & plastic
Materials: Metals, plastics
Lead Time: 1–10 days
Qty Sweet Spot: 1–10,000
Tolerance: ±0.0001"

Injection Molding

Best For: Mid to High-volume
Materials: Thermoplastics
Lead Time: 2–6 weeks
Qty Sweet Spot: 200-1M+
Tolerance: ±0.005"

Sheet Metal

Best For: Enclosures, brackets
Materials: AL, steel, SS
Lead Time: 2 - 14 days
Qty Sweet Spot: 1–50,000
Tolerance: ±0.005"

3D Printing

Best For: Complex geometry
Materials: Plastics, resins
Lead Time: 1–5 days
Qty Sweet Spot: 1–500
Tolerance: ±0.005"

Die Casting

Best For: Complex metal at vol.
Materials: AL, zinc, mag.
Lead Time: 3–8 weeks
Qty Sweet Spot: 1K–500K+
Tolerance: ±0.002"

Urethane Casting

Best For: Low-vol plastic
Materials: PU resins
Lead Time: 10–15 days
Qty Sweet Spot: 1–200
Tolerance: ±0.010"

Compression

Best For: Rubber & composite
Materials: Thermoset, rubber
Lead Time: 3–6 weeks
Qty Sweet Spot: 100–50K
Tolerance: ±0.010"

Process Best For Materials Lead Time Qty Sweet Spot Tolerance
CNC Machining Precision metal & plastic Metals, plastics 1–10 days 1–10,000 ±0.0001"
Injection Molding Mid to High-volume Thermoplastics 2–6 weeks 200-1M+ ±0.005"
Sheet Metal Enclosures, brackets AL, steel, SS 2 - 14 days 1–50,000 ±0.005"
3D Printing Complex geometry Plastics, resins 1–5 days 1–500 ±0.005"
Die Casting Complex metal at vol. AL, zinc, mag. 3–8 weeks 1K–500K+ ±0.002"
Urethane Casting Low-vol plastic PU resins 10–15 days 1–200 ±0.010"
Compression Rubber & composite Thermoset, rubber 3–6 weeks 100–50K ±0.010"

Quality & Certifications

ISO 9001:2015
Quality Mgmt
ISO 13485:2016
Medical Devices
AS9100D
Aerospace
IATF 16949:2016
Automotive & Electric Vehicles
NADCAP
Special Processes

Ready to get started?

Upload your CAD file for instant DFM feedback and pricing.

Get Instant Quote Talk to an Engineer

ISO 9001:2015 Certified · 95.4% On-Time Delivery · Trusted by 3,000+ Companies