Manufacturing Specifications by Capabilities | Fictiv
Manufacturing Specifications & Design Guidelines
Specifications by Capability
Select a manufacturing process to view detailed specifications, tolerances, materials, and design guidelines.
CNC Machining
Tolerances as tight as ±0.0001". 45+ materials. As fast as 1 day. View Specs→
Sheet Metal
Laser cutting, bending, welding. AL, steel, SS. 5–15 day lead time. View Specs→
3D Printing
6 technologies: FDM, SLA, SLS, MJF, PolyJet, Carbon DLS. View Specs→
Injection Molding
Rapid to production tooling. T1 samples in 10 days. Full PPAP. View Specs→
Surface Finishes
Anodizing, powder coat, plating, ENP, passivation & 8 more. View Specs→
Calculators
Unit converter, thread checker, bend allowance, ISO fits. View Specs→
GD&T Reference
Geometric tolerancing symbols, feature control frames, modifiers. View Specs→
Not sure which process fits your project?
Most engineers start with material and volume. Here's a quick comparison.
CNC Machining
Best For: Precision metal & plastic
Materials: Metals, plastics
Lead Time: 1–10 days
Qty Sweet Spot: 1–10,000
Tolerance: ±0.0001"
Injection Molding
Best For: Mid to High-volume
Materials: Thermoplastics
Lead Time: 2–6 weeks
Qty Sweet Spot: 200-1M+
Tolerance: ±0.005"
Sheet Metal
Best For: Enclosures, brackets
Materials: AL, steel, SS
Lead Time: 2 - 14 days
Qty Sweet Spot: 1–50,000
Tolerance: ±0.005"
3D Printing
Best For: Complex geometry
Materials: Plastics, resins
Lead Time: 1–5 days
Qty Sweet Spot: 1–500
Tolerance: ±0.005"
Die Casting
Best For: Complex metal at vol.
Materials: AL, zinc, mag.
Lead Time: 3–8 weeks
Qty Sweet Spot: 1K–500K+
Tolerance: ±0.002"
Urethane Casting
Best For: Low-vol plastic
Materials: PU resins
Lead Time: 10–15 days
Qty Sweet Spot: 1–200
Tolerance: ±0.010"
Compression
Best For: Rubber & composite
Materials: Thermoset, rubber
Lead Time: 3–6 weeks
Qty Sweet Spot: 100–50K
Tolerance: ±0.010"
| Process | Best For | Materials | Lead Time | Qty Sweet Spot | Tolerance |
|---|---|---|---|---|---|
| CNC Machining | Precision metal & plastic | Metals, plastics | 1–10 days | 1–10,000 | ±0.0001" |
| Injection Molding | Mid to High-volume | Thermoplastics | 2–6 weeks | 200-1M+ | ±0.005" |
| Sheet Metal | Enclosures, brackets | AL, steel, SS | 2 - 14 days | 1–50,000 | ±0.005" |
| 3D Printing | Complex geometry | Plastics, resins | 1–5 days | 1–500 | ±0.005" |
| Die Casting | Complex metal at vol. | AL, zinc, mag. | 3–8 weeks | 1K–500K+ | ±0.002" |
| Urethane Casting | Low-vol plastic | PU resins | 10–15 days | 1–200 | ±0.010" |
| Compression | Rubber & composite | Thermoset, rubber | 3–6 weeks | 100–50K | ±0.010" |
Quality & Certifications
ISO 9001:2015
Quality Mgmt
ISO 13485:2016
Medical Devices
AS9100D
Aerospace
IATF 16949:2016
Automotive & Electric Vehicles
NADCAP
Special Processes
Ready to get started?
Upload your CAD file for instant DFM feedback and pricing.
Get Instant Quote Talk to an Engineer
ISO 9001:2015 Certified · 95.4% On-Time Delivery · Trusted by 3,000+ Companies